CONTACT US:

Toll-Free 1-884-669-0981
(785) 286-7750 (8-5 CST)
Fax: (785) 267-9201
Email: info@powerprefab.com
4140 Martin Drive, Topeka, Kansas 66609

Savings Comparison

Increase Profits and Market Share

See the Advantage POWER PREFAB Creates within an Estimate.

 

POWER PREFAB Savings

Contractor's Man-Hours Saved on Job 2422.13
Branch Wiring Cost Savings $ 61,132.15
Labor Savings Percentage 73.2%
Branch Wiring Cost Savings Percentage 30.3%

Bid Breakdown utilizing Typical Installation of Branch Wiring

Contractor's Raw Material   $ 53,183.50
Contractor's On-Site Man-Hours 3308.50  
Burdened Hourly Rate for Crew $ 45.00  
Direct Labor Cost Job   $ 148,882.50
Standard Branch Wiring Cost Esmate   $ 202,066.00
 

Bid Breakdown utilizing POWER PREFAB of Branch Wiring

POWER PREFAB Quote Cost   $ 98,220.00
Contractor's Support Materials   $ 2,827.20
Contractor's On-Site Man-Hours 886.37  
Burdened Hourly Rate for Crew $ 45.00  
Direct Labor Cost Job   $ 39,886.65
Standard Branch Wiring Cost Esmate   $ 140,933.85